After a short break, Daniel Hearn is back in the saddle, so to speak, with his C Skeeter basement build.

Previously:
“The Inspector”
“Building In The Big City”
“New Ways to Shave”
“Heavy Metal Lightweight”
“It’s a Bubble”
“Simon Says”
“Frosting For Frozen Fun”
“When Your Plank Needs Work”
“A Weak Moment

Saddle Up, Cowboy

Yeah, I know, it’s been awhile since my last update. In between that work thing and summer pursuits, my time blocks for the shop are short and less frequent, but I’ve been chipping away at the iCe rocket. (No, that’s not the boat name, but it will be a subject of a future blog). My internal mechanicals are now complete, and I’ve been doing lots of sanding on the cockpit carbon to make it look all purdy. I’ll give you the full tour in my next blog.

 

My nightly ritual this week has been laminating carbon to form the “saddle” which will attach my rocket to the launch pad. At the center point of the plank I laid out a layer of peel ply, then formed the saddle around the plank. I lost track of how many layers, but it was a great way to use up my scraps of both uni and cloth, interspersed with full size pieces. My technical consultant advised that the saddle needed to be stronger than the hull itself, so I just kept adding layers each night until I got to a thickness of about 3/8”. Once there, I rough trimmed the saddle and cut a matching profile in the bottom of my hull to prepare it for glue on. After I glue it on, I’ll reinforce the attachment with carbon fillets on the inside and outside of the hull. The outside fillets will cover up the mounting plates for the titanium axle that holds my exit block in position.

 

It was noticeably cooler this morning for my sun-up open water swim. Ice is a good way off yet, but the seasons are starting to sniffle. This cowboy is excited to break in a wild mare branded M-177!